How Are We Going to Build All That Clean Energy Infrastructure?

Download the document.

Most analyses find that to manage climate change, the United States will need to double or triple the size of its electric transmission system to move low-cost wind and solar energy around the nation and back it up with always-on power plants. But new report from Clean Air Task Force and the Niskanen Center finds that the current piecemeal, project-by-project approach to expanding U.S. electricity transmission won’t get us there. It instead calls for a new system to rapidly scale capacity — including by potentially establishing a National Transmission Organization that would plan, site, and fund a national grid to ensure that burdens and benefits are fairly shared.

The report synthesizes the findings from independent research and a workshop composed of a diverse array of experts from academia, industry, and environmental organizations. It outlines a wide range of options for revamping U.S. transmission oversight, planning, and permitting. Additionally, it includes both a pathway with a better organized private sector presence and a pathway with greater government engagement. These possibilities sit on a spectrum, and creative hybrids are possible.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: